top of page


PV System Design and Planning (CSSD)
Price
$900
Location
TBA
About the Course
·      Load analysis
·      Sizing principles.
·      Manual design of rooftop PV system (5 kW).
·      Introduction to PVsyst/Helioscope.
·      PVsyst simulation of 50 kW plant (shading, tilt, azimuth).
·      Electrical design principles (strings, inverters, BOS).
·      AutoCAD Electrical layout of a 1 MW plant.
·      Group project: Compare two system designs.
bottom of page
